Sr. No. | Description of Project | Remarks |
1 | Construction of SAIWAN - ALAM (16”) Oil Pipeline and Launcher, Receiver, BV Stations, Blasting and Shrink Sleeves Application |
Completed |
2 | Construction of FARHA - SAIWAN (10”) Oil Pipeline and Launcher, Receiver, BV Stations, Blasting and Shrink Sleeves Application |
Completed |
3 | Construction of flowlines, headers & installation of manifold stations (1500 #) for Amal Steam Off-plot and Equipment Erection (Manifold, Beam Pump & PCP) |
Completed |
4 | Blasting & Painting of Tanks, related Piping and Structural Steel for Daleel Power Plant |
Completed |
5 | Procurement & Construction of two storage tanks at Daleel |
Completed |
6 | Fabrication & Installation of on-plot piping, supply & installation of PE lining, erection of pumps & vessels at Daleel DPS & B’ block |
Completed |
7 | Construction of various flow lines for ODC South |
Completed |
8 | Internal & external Painting of Storage tanks for Amal on-plot contract (PCS-1, 3, 7B & 8) |
Completed |
9 | Blasting & Painting of Storage Tanks at Salalah Methanol Project |
Completed |
10 | GRE lining for drain vessels & concrete surfaces at Salalah Methanol plant |
Completed |
11 | Fabrication & erection of various structural works at Oxy Mukhaizna as sub-contractor to STS on the 2yrs. civil service contract |
Completed |
12 | Intumescent painting (Passive fire protection) for steel structures at Barka Car Museum |
Completed |
13 | Intumescent painting (Passive fire protection) for steel structures at Sohar |
Completed |
14 | Blasting & Painting works of Birba Gas Injection Pipeline Project |
Completed |
15 | Internal & External Painting of Tank at Oman Oil |
Completed |
16 | Shutdown Maintenance at Rusayl Power Plant (Gas Turbines) |
Completed |
17 | Blasting & Painting of Mud Tanks for Rig 103 |
Completed |
18 | Blasting and Painting of Tanks at Barka II Power & Desalination Project |
Completed |
19 | Painting of Tanks at Fahud Steam Injection Plant |
Completed |
20 | Painting of Pipe Rack Structures for Qarnalam Steam Plant |
Completed |
21 | External Blasting and Painting of HDS Reactor for MRPL at L & T Sohar |
Completed |
22 | Piping and Mechanical Construction Call off Services – CCED (Block 3&4)
CC Energy Development SAL awarded 3 years’ service contract on May 2017 for Piping and Mechanical construction works which includes station piping, Early production facility, maintenance works, Erection of equipment’s Scaffolding and hook up piping covers CS, SS and DSS all materials. |
Completed |
23 | Pipeline and Flowline Construction Services – CCED (Block 3&4)
CC Energy Development SAL awarded 3 years’ service contract on October 2016 for construction and testing of Trunk line, Flow line, Water Injection lines, Produced water injection lines, Pipeline and on plot piping hook ups covers CS + HDPE materials. |
Completed |
24 | Procurement and Construction of Flowlines – Petrogas Rima (Rima Small Field)
Petrogas Rima awarded 3 + 2 years’ service contract on May 2014 for Engineering, Procurement and construction of flowline, hearder, pipeline, station piping, equipment erection and hook up piping coves CS+HDPE materials |
Completed |
25 | Sub-Contracting for EPC works for Salalah IPP2 Phase 2 – ZawawiPowertech Engineering / Oman Gas Company (Salalah)
Zawawi Powertech Engineering awarded sub-contracting of construction contract on March 2017 for construction of Piping, equipment erection, tank erection, testing and pre commissioning works covers CS materials. |
Completed |
26 | Sub-Contracting for Lekhuwair combined cycle power plant – ZawawiPowertech Engineering / Petroleum Development of Oman (Lekhwair)
Zawawi Powertech Engineering awarded sub-contracting of construction contract on March 2017 for Procurement, construction of Piping, equipment erection, tank erection, testing, piping, pipeline and pre commissioning works covers CS, SS & GRE materials. |
Completed |
27 | QAMP 101 - QAM to PDO-MOL and Burhan North to QAM EPC Pipelines Contract
Engineering, Procurement, Construction (EPC) for Two 10 Inch (CS & CS+PE Line) Pipelines - 54 Km at Qarat Al Milh Site, the contract Awarded by Qarat Al Milh Petroleum LLC.
|
Completed |
28 | ARA E&P 133 Construction of Water Disposal LIne at QAM Procurement of Shortage Materials and Construction of Water Disposal Header - 8 kilometer (CS+PE Line) at QAM , the contract Awarded by ARA Petroleum E&P LLC. |
Completed |